Skip to content

Boring for landscapers in Adelaide and the Fleurieu

We do the crossings on landscaping jobs: irrigation, power and water through to the far side of a driveway, path or raised bed, without a trench through anything you've just laid. Send a photo and the distance from site and we'll price it by the next business day, so it can go into your quote.

Get a price

Why landscapers use us

A garden bed beside an exposed aggregate driveway, filled back in and level, with two black pipe ends standing out of the soil and the driveway untouched.
The garden bed filled back in the next morning

On a landscaping job, the finished surface is what your client is paying for, so a trench through new paving or a fresh lawn is a big problem.

We turn up with the mole, hose and compressor, dig two small pits, bore across, pull the conduit through and fill the pits back in. There's no excavator on your site and nothing you've laid gets dug up.

When to bring us in

  1. At quoting

    As soon as you know the design needs something on the other side of a hard surface, send us the photo and the distance from site. You'll have our price before you write your quote.

  2. Before the hard landscaping goes down

    If we can bore before the paving, lawn and planting go in, the pits open into bare ground and there's nothing finished to work around. It's quicker and costs less.

  3. After the garden is finished

    We can still bore it. It takes more care around a finished garden, but it's still only two small pits.

What we get under

An open pit beside an exposed aggregate driveway with a black line along the bottom, a black air hose looping across the untouched concrete from a blue oiler, and a shovel on the spoil.
The pit, with the air hose run across the driveway

Concrete driveways, exposed aggregate, stamped concrete, pavers, brick paths, gravel drives, established lawn and mature garden beds. The pits go in soft ground on each side, so we can bore under all of these.

The conduit can carry irrigation, power out to lighting or a pump, water to a tap or tank, or comms. Bores run 1 to 12 metres with conduit up to 45mm.

On your site

A long pit along a roadside verge beside the kerb, with the air hose run out, a laser level on the grass beside it, and the compressor and ute on the road behind cones.
Pit along the verge, hose out, level set up

We lodge a Before You Dig Australia enquiry before every bore. Old lines that were never recorded often turn up in established gardens, so if there's any doubt we get a certified locator out first.

We hold a Building Work Contractors Licence, BLD 229616, and carry $20,000,000 public and products liability plus plant cover. If your client or head contractor wants the certificate of currency, just ask.

On the day we bore, fill the pits in, rake it over and go. We're not there to talk to your client about the rest of the job.

What landscapers say

Gus's experience in the landscape industry helped get the job done with minimal disruption

Jai Fowley

What it costs you

We price from a photo and the distance across.

Questions from landscapers

Call 0402 855 619

By the next business day, from a photo and the distance across.

No. We bore the crossing and leave the conduit where your plan wants it. You run the line and set up the system.

Yes, if the plan shows the crossing and the distance. A photo is still useful because it shows us the access and the surface.

It can usually be split into more than one bore, with a pit in between. We'll tell you on the phone whether that works or whether you need a directional rig instead.

Get a price for your crossing

Send a photo of the spot, the rough distance across, and how many crossings there are. We'll get back to you by the next business day. Or call Gus on 0402 855 619.