Boring under roads and footpaths in Adelaide and the Fleurieu
We bore under roads, footpaths, kerbs and crossovers to get conduit to the other side without digging up the surface. We dig a small pit in the verge on each side, bore across, and pull the conduit through. Bores run 1 to 12 metres with conduit up to 45mm, across Adelaide and the Fleurieu.
Get a price
What cutting a road costs
Cutting a footpath or road to lay conduit is the expensive way to do it. You pay for the saw cut, getting rid of the spoil, traffic control, and then putting the surface back to the road authority's standard, which is usually the biggest line on the bill. And the repair never quite matches.
When we bore it, the road and footpath aren't touched. The only digging is a small pit in the verge on each side.
-
We check what's already under there
We don't start until the Before You Dig Australia (BYDA) plans are in and we've read them. There are more services under a road and its verges than anywhere else, so if the plans leave any doubt we get a certified locator out before we dig.
-
We dig a pit each side
One pit in the verge on each side of the crossing, clear of the sealed surface. They're narrow, just deep enough to sit the machine at the depth the conduit needs to run.
-
The machine bores across
Compressed air drives the mole from one pit to the other, pushing the soil aside rather than digging it out. Nothing above it moves, so the road, footpath and kerb stay as they are.
-
We pull the conduit through
The conduit follows the bore back through the ground. We fit conduit up to 45mm, which covers power, water, irrigation and comms.
-
We backfill and tidy up
We fill both pits back in and leave the verge the way we found it.
How far and how big
A suburban road plus both verges is usually under 12 metres, and so is nearly every footpath and kerb crossing. If your job is longer, or it's a main road or highway, you need a directional drilling contractor, and we'll tell you that on the phone so you don't waste time.
- Bore length
- 1 to 12 metres
- Typical residential job
- 5 to 10 metres
- Conduit
- Up to 45mm
- Ground
- Sand, clay and shale. The ground type changes the price.
- Pits
- One small entry pit and one small exit pit, in the verge either side
- What it isn't
- A steerable directional drilling rig. Past 12 metres, or a major road or highway crossing, you need one of those.
What it costs
We price a crossing from a photo and the distance from verge to verge.
Send a photo of the crossing and the rough distance and we'll send you a price by the next business day.
What moves the price
- How long the bore is
- How big the conduit is
- The ground: sand, clay or shale
- Access for the machine and compressor
- Putting back concrete or paving
- Whether you need a certified locator
Questions about road and footpath boring
Call 0402 855 619No. We bore underneath it from a pit in the verge on each side, so the footpath, the kerb and the road are never opened.
Yes. There's more under a road and its verges than anywhere else, so the Before You Dig enquiry goes in on every job and we bring a certified locator when the plans aren't clear.
Most crossings are 5 to 10 metres, and the machine goes to about 12. A suburban road plus both verges usually fits.
Up to 45mm.
Yes. $20,000,000 public and products liability, with plant cover on top.
Yes. A narrow verge is enough room for us.
Then you need a directional drilling contractor. We'll tell you that on the phone rather than start a job the machine can't finish.
Get a price for your crossing
Send a photo of the crossing and the rough distance across. We'll price it by the next business day. Or call Gus on 0402 855 619.